Holly Shrine of Imam Hussain a.s
News

New method of building walls adopted to build Lady Zaineb Shrine

1,070 views1 min read

 

A new method of building has been adopted by the Department of Engineering Projects, which is using the sand of Lady Zaineb Shrine Project to make bricks and build some of the walls of the shrine.

 

Abbas El-Beyati, engineer and project director, said that this method is economical and eco-friendly.

 

He added that the soil of the holy city of Kerbela, especially what is surrounding Imam Hussein and El-Abbas Shrines, is the holiest soil the world over, because it is blessed.

 

 

By: Mohammed Hemeed Es-Sewaf and Amer Nuri

Translation: Mohammed Alobaidi

Related

Comments (0)

Leave a comment

Sign in to comment with your verified account.